Underground Drainage and Sewerage
In the urban areas the population density is high and in many cases land availability is constrained. In many urban centres the centralized sewerage systems aren’t properly designed which affect the environment and quality of people’s life. Therefore, the designing of scientific and appropriate underground drainage systems becomes important in urban settings.



Detailed Project Report (DPR)
The services provided by us under DPR preparation include collection and studying of existing data and functioning of present sewerage scheme; detailed surveys and strata explorations using total station and GPS; population projections; topographical and geotechnical surveys; hydraulic modelling of sewerage networks using SewerGEMS software; designing pumping station and Sewage Treatment Plant (STP); detailed engineering of electrical and mechanical components; designing SCADA systems for automation; and prepare estimations to help effective execution.
Project Details
Sr. No. | Name of Project | Client | Project Location | Year of Completion | Project Type |
---|---|---|---|---|---|
1 | Design analysis and Hydraulic modeling of sewerage of Jalgaon City. | Maharashtra JeevanPradhikaran | Jalgaon, Maharashtra | 2017 | Hydraulic Designing |
2 | “Providing consultancy services and preparation of preliminary survey, Design, preparation of DPR, Tender Document and Project management/Supervision for sewerage network, Sewage Pumping station and Sewage treatment plant Preferably based on Sequential Batch Reactor/Cyclic Activated Sludge Process Centralized/Decentralized as feasible to the Cantonment Board Kamptee” | Cantonment Board Kamptee, Nagpur | Kamptee, Nagpur, Maharashtra | 2017 (DPR) | DPR Preparation & PMC |
3 | Providing Consultancy Services and Preliminary Survey, Design, Preparation of DPR, Tender document and Project Management/ Supervision for Sewerage Network, Sewerage Pumping Station and Sewerage Treatment Plant Based on Sequential Batch Reactor /Cyclic Activated Sludge Process for Civil Population of Dehuroad. | Cantonment Board Dehuroad, Pune | Dehuroad, Pune, Maharashtra | 2017 (DPR) | DPR Preparation & PMC |
4 | Consultancy for Rishikesh Comprehensive Municipal Waste Water Project | Uttarakhand Peyjal Sansadhan Vikas evam Nirman Nigam | Rishikesh, Uttarakhand | 2017 | DPR Preparation |
5 | Consultancy For Central Sewage Treatment Plant(STP) at GE (Jorhat) And GE 869 EWS (Leimakhong) under Chief Engineer Shillong | Military Engineering Services, Shillong | Shillong, Meghalaya | 2016 | DPR Preparation |
6 | Preparation of DPR for Pollution Abetment of Indrayani River at Alandi under NRCP | Alandi Municipal Council | Alandi, Pune, Maharashtra | 2015 | DPR Preparation |
7 | Preparation of DPR for Pollution Abetment of River Mula/Mutha at Pune (100% collection and treatment of sewerage in Pune Municipal Corporation area) | Maharashtra JeevanPradhikaran | Pune, Maharashtra | 2013 | DPR Preparation |
8 | Preparation of Detailed Project Report for Sewerage system in Shegaon City, Maharashtra, India | Fortress Infrastructure Advisory Services | Shegaon, Maharashtra | 2010 | DPR Preparation |
9 | Preparation of DPR for the sewerage system of Chandrapur city | Chandrapur Municipal Council | Chandrapur, Maharashtra | 2007 | DPR Preparation |




Master Planning
PriMove provides services for developing master plans for sewerage systems in urban and rural areas for government bodies, private industrial and residential townships. Our ability and experience of working at both national policy level and grassroots levels gives us a unique perspective to provide a complete solution to our clients.
Project Details
Sr. No. | Name of Project | Client | Project Location | Year of Completion | Project Type |
---|---|---|---|---|---|
1 | Preparation of Master Plan for Sewerage Scheme for Pune City and Newly Merged 11 Villages. | Pune Municipal Corporation | Pune, Maharashtra | Ongoing | Master Plan Preparation |
2 | Preparation of Master Plan & DPR for sewerage System of Pune City | Pune Municipal Corporation | Pune, Maharashtra | 2009 | Master Plan Preparation |




Project Management Services
PriMove provides Project Management on sewerage projects. Our team ensures that projects are executed as per milestones with proper quality checks in place. The service includes construction quality management; material testing; time and cost management; measurements and records along with reporting as per client and project needs; supervising construction of collection network, pumping mains and STPs. We also carry out robotic surveys of underground drainage systems.
Project Details
Sr. No. | Name of Project | Client | Project Location | Year of Completion | Project Type |
---|---|---|---|---|---|
1 | “Providing consultancy services and preparation of preliminary survey, Design, preparation of DPR, Tender Document and Project management/Supervision for sewerage network, Sewage Pumping station and Sewage treatment plant Preferably based on Sequential Batch Reactor/Cyclic Activated Sludge Process Centralized/Decentralized as feasible to the Cantonment Board Kamptee” | Cantonment Board Kamptee, Nagpur | Kamptee, Nagpur, Maharashtra | Ongoing | Project Management Consultancy |
2 | Providing Consultancy Services and Preliminary Survey, Design, Preparation of DPR, Tender document and Project Management/ Supervision for Sewerage Network, Sewerage Pumping Station and Sewerage Treatment Plant Based on Sequential Batch Reactor /Cyclic Activated Sludge Process for Civil Population of Dehuroad. | Cantonment Board Dehuroad, Pune | Dehuroad, Pune, Maharashtra | Ongoing | Project Management Consultancy |
3 | Project Management Consultancy for Drainage System in Karad under Maharashtra NagarotthanMahaabhiyan Project | Karad Nagar Parishad | Karad, Maharashtra | 2016 | Project Management Consultancy |
4 | Project Management Consultants for Under Ground Sewerage Scheme Under UIDSSMT for Malkapur Nagar Panchayat | Malkapur Nagar Panchayat | Malkapur, Maharashtra | 2018 | Project Management Consultancy |